OMAN SUSTAINABILITY WEEK
  • Home
  • Exhibit & Sponsor
    • Why Exhibit or Sponsor

    • Enquire to Exhibit

    • 2025 Post Event Report

  • Visit
    • GET YOUR FREE TICKET

    • Why Visit

    • Travel & Accommodation

  • 2026 Exhibitor List
  • OSW Activities
    • C-Level Roundtable

    • Future Mobility

    • ISRTC

    • Site Visits

    • OSW Talks

    • VIP Majlis

    • Sponsors & Partners

  • OSW Awards
    • ESG Awards

    • Eco-Mobility Awards

    • Energy Efficiency Excellency Award

    • Sustainable Stand Award

  • News
    • Q&A Series

    • Industry Updates

    • Brand Ambassadors

    • Gallery

  • About
    • Committee

    • Media Partners

    • Initiatives to reduce event impact

  • Contact
  • APP
    • Download APP

    • Mobile APP Guide

  • Show more
Vinexpo Asia 2026

Roni Barua Portfolio Director - OSW & OPES Roni.Barua@connectthroughus.com

Copyright © 2026. CONNECT. All rights reserved.

  1. Home

  2. /
  3. News

  4. /
  5. First wind turbine installed at PDO’s Riyah-2 project

First wind turbine installed at PDO’s Riyah-2 project

February 2, 2026
Share this article
Leading Chinese wind turbine manufacturer Goldwind has announced the successful installation of the first wind turbine at the Riyah-2 wind farm project in Nimr West in Dhofar Governorate — the first of a cluster of 18 wind towers that will support the decarbonisation of Petroleum Development Oman’s (PDO) oil and gas operations.

Together with Riyah-1 — currently nearing completion at nearby Amin — the twin wind farms will have a combined generation capacity of 234 MW, making this the largest wind project in Oman’s wind energy landscape to date.

In a post, Goldwind described the hoisting of the first wind turbine at Riyah-2 as “a major construction milestone for Oman’s largest wind power initiative”.

“Once operational, the wind farm — located in the high-wind regions of Dhofar and Al Wusta — will supply clean electricity to PDO, supporting the decarbonisation of its traditional oil and gas operations and contributing to Oman Vision 2040 and net-zero goals. Strategically sited to maximise wind resources, the project is expected to reduce CO₂ emissions by approximately 740,000 tonnes annually”, the company noted.

Both Riyah-1 and Riyah-2 are being developed by a joint venture comprising OQ Alternative Energy (51%), a wholly owned subsidiary of OQ and TotalEnergies (49%). Renewable energy output from the two wind farms, alongside the North Oman Solar IPP under construction in PDO’s Block 6 licence area, will be supplied to PDO under long-term Power Purchase Agreements (PPAs). The OQAE–TotalEnergies JV will own and operate the projects for the duration of the PPAs.

Chinese firm Huadong Engineering Corporation, a subsidiary of PowerChina, is the EPC contractor for the wind farm projects. The turbines are being supplied by Goldwind, which is providing a total of 36 GWH-182 series high-efficiency, climate-adapted turbines suited to Oman’s desert conditions.

“We are building green infrastructure to power traditional industries, proving that renewables are key to a low-carbon future. Meeting the rigorous safety and technical standards of the oil and gas industry, our GWH-182/6.5MW turbines are rising to the challenge in Salalah”, Goldwind added.

The two wind farms are slated to come into operation in the fourth quarter of this year.




Source: Oman Observer

Recommended News for You

Award-winning LNG study cuts energy use
March 1, 2026
Oman Banks build climate finance skills
February 24, 2026
Madayn–be’ah pact strengthens industrial waste management
February 17, 2026
$216m EV battery materials project advances in Oman
February 14, 2026
From Impact to Income: Why Sustainability Reporting Matters for Long-Term Value
February 10, 2026OSW News by Swathi Suresh